A dilapidation report records the visible condition of agreed property areas at the time of inspection, commonly before construction or nearby works begin. It provides a dated baseline for later comparison. It does not, by itself, prove who caused damage or establish responsibility for repairs.

Why timing matters

A baseline is most useful when the inspection takes place before relevant works start. If work is already underway, tell the inspector: a report can record current condition but cannot retrospectively show everything that existed beforehand. Keep any earlier photographs or records and identify their dates and sources.

Arrange access early rather than leaving the inspection until machinery arrives. Confirm which properties, structures and areas need to be covered, who can authorise access and when the report must be delivered.

What can the report record?

The agreed scope may include accessible internal and external surfaces, existing cracks, visible damage and other condition observations. Photographs need location descriptions so readers can understand what they show. The report should identify inspected areas and restrictions, such as locked rooms or finishes concealed by belongings.

A record of visible condition is different from a structural engineering assessment, invasive investigation or a complete survey of every concealed component. Explain the purpose before booking so the correct service and professional can be selected.

Check the actual project requirements

Where a development consent, certifier or contract requires a dilapidation report, send the relevant wording before requesting a quote. Requirements vary between projects and can specify the areas to include, reporting stage and qualifications required. Some require an engineer; do not assume every building inspector’s report will satisfy every condition.

Ask the relevant certifier or authority to clarify ambiguous requirements before engaging someone. For an example of project-specific pre- and post-development documentation, see Wentworth Shire Council’s construction certificate guidance; its requirements should not be applied automatically to a different council or project.

What happens after the works?

A separately agreed follow-up inspection can compare accessible areas with the original record. Changes in condition may need further investigation to understand their cause and significance. Do not treat a before-and-after difference as automatic proof of liability.

Keep the original report, photographs, access correspondence and relevant works dates together. Where access was unavailable at the first visit, the comparison will have corresponding limitations.

How much does a ProVision report cost?

ProVision dilapidation reports start from $300 including GST. The final quote depends on the agreed properties, areas, access and requirements. A later comparison visit should be discussed separately; do not assume it is included in the starting price.

For Revesby, Padstow, Moorebank, Liverpool and surrounds, send Ray the address, proposed works, expected start date, access contacts and any consent or certifier requirements. If you instead need an assessment of an existing specific concern, discuss a building defect report.